Skip to main content
HARCH|CORP
PlatformResearchManifestoAboutPricing
Building in Public
Contact

PLATFORMS

Demo PlatformHarchOSHarchLinkAtelier

Verticals

Intelligence/0.1Cement/0.2Energy/0.3Technology/0.4Mining/0.5Agri/0.6Water/0.7Finance/0.8

Company

AboutLeadershipStrategyEsgDeiHarch VenturesCareersPartnersPress MediaRequest QuoteRequest Briefing

Developers

DocumentationAPI ReferenceSdksDeveloper CenterApi PlaygroundOpen SourceArchitectureChangelog

Resources

ResearchBlogEngineering BlogCommunityEventsLearn CertifyGlossaryStatusSupportFaqStyle Guide

Trust

Trust CenterSecurityComplianceAI EthicsVulnerability DisclosurePrivacy PolicySystem Status

Business

PricingCalculatorCustomersStartup ProgramInvestor Relations

Latest News

Harch Corp CEO at African Infrastructure Summit

January 2025

Carbon-aware GPU hubs powering AI across Africa

March 2025

Harch Corp expands operations to Gambia

June 2025

Harch Corp
Casablanca, Morocco
Building in Public · Founded 2024

Systems in engineering phase
|99.98% Uptime
SecurityCompliancePrivacy PolicySystem StatusTrust Center

Vision 2024-2030 — Building in PublicHarch Corp presents its 2024-2030 strategic vision. Operational capabilities are in deployment phase. We document every step of the journey. Follow the trajectory.

Harch Corp

© 2026 Harch Corp. All rights reserved.

Legal HubPrivacy PolicyTerms of ServiceCookie PolicyGdprSla

Building in Public · Casablanca, Morocco · Founded 2024

Harch Intelligence Dakhla flagship datacenter at dusk — sovereign AI compute on African soil
HARCH · INTELLIGENCECasablanca · Dakhla · Dakar
Harch Intelligence

Sovereign AI Compute

on African soil · powered by African sun

1,798
Carbon-Optimized GPUs (Planned)
5
Hubs Across Africa
99.98%
Target Uptime SLA
Get started freeCall us
// 01Overview

Africa's largest AI hyperscale

Africa imports 95% of its AI compute from US and EU clouds. Harch Intelligence changes this. We plan 1,798 GPUs across 5 hubs in Morocco, Senegal, and Côte d'Ivoire — sovereign AI infrastructure designed to run on African renewable energy. Train your models on African soil, under African data sovereignty law. No GDPR conflicts, no US CLOUD Act exposure.

Casablanca HQDakhla FlagshipTanger CableDakar HubAbidjan Hub
Harch Intelligence hyperscale datacenter exterior — Tier-III facility, Dakhla Hub
FLAGSHIP FACILITY
Dakhla · Hub #001
512 GPU · PUE 1.15 · 100% renewable
// 02Sovereignty

African data, under African law

Harch Intelligence operates exclusively under Moroccan Law 09-08 and the African Union Convention on Cybersecurity. Your training data, model weights, and inference traffic never leave African soil. No US CLOUD Act exposure. No GDPR cross-border conflicts. Sovereign AI by design.

Law 09-08·Sovereign by design

Governing framework

MA-09/08
Moroccan Law 09-08

Personal data protection — CNDP registration, on-soil processing, mandatory breach notification.

AU-CONV
AU Convention on Cybersecurity

Pan-African data sovereignty framework ratified by 14 member states including Morocco, Senegal, Côte d'Ivoire.

US-CLOUD
US CLOUD ActPASS

NOT applicable — Harch Intelligence has zero US entity, zero US-issued warrants honored, zero data replication to US regions.

GDPR-ART49
GDPR Article 49 derogationsPASS

NOT triggered — data never leaves Africa, so no adequacy decision or derogation is required for EU customers.

// 03Live Dashboard

One console for compute, storage, and inference

HarchOS unifies GPU scheduling, object storage, and inference endpoints under a single control plane. Switch views below to inspect the same fleet from three angles — every metric live, every workload auditable, every byte sovereign.

https://harchos.africa/dashboard
live
Harch Intelligence GPU cluster close-up — NVIDIA H100 SXM5 modules with NVLink fabric
GPU CLUSTER · 1,798 H100 SXM5 (PLANNED)
GPU Utilization
87.4%
Active Jobs
142
PUE
1.15
Carbon Intensity
0.02 gCO2/kWh
GPU rack · live
8/8 nodes ready
gpu-00
89%
47°C
gpu-01
85%
46°C
gpu-02
91%
48°C
gpu-03
73%
44°C
gpu-04
78%
45°C
gpu-05
87%
47°C
gpu-06
82%
46°C
gpu-07
90%
48°C
harchos-cli · provision
live
$ harchos login --region dakhla
→ authenticated · tenant harch-corp-prod
$ harchos gpu provision --type H100 --count 8
→ reserving 8x H100 SXM5 · Dakhla Hub #001
→ InfiniBand fabric configured · NCCL verified
→ liquid cooling loop nominal · 24.1°C delta
→ provisioning ok · elapsed 87.4s
scale event · 1 → 1024 GPUs87.4s
kubectl get pods -n harchos-compute● 8/8 ready
live·Dakhla · Hub #001·8/8 nodes ready·100% renewable
Hyperscale datacenter infrastructure
// 04Hardware

Hyperscale datacenter infrastructure

Tier-III designed datacenters with N+1 cooling, 2N power, biometric access. NVIDIA H100 and H200 GPU clusters. Liquid cooling for density. PUE 1.15 (industry average 1.5). Powered by 100% renewable solar + wind. Submarine cable connectivity via ACE, MainOne, Africa Coast to Europe.

PUE 1.15
Power usage effectiveness, 30% below industry
100%
Renewable energy solar + wind
Tier-III
Datacenter design certification
// 05Hardware

NVIDIA H100 and H200 GPU clusters

1,798 GPUs planned for deployment — H100 SXM5 80GB, H200 141GB, A100 80GB, L40S for inference. NVLink fabric, InfiniBand 400G, liquid cooling. Carbon-aware scheduler routes workloads to the greenest hub in real-time.

GPUMemoryBandwidthTDPStatus
H100 SXM580 GB HBM3900 GB/s NVLink700 WIn production
H200 SXM5141 GB HBM3e900 GB/s NVLink700 WQ1 2026
A100 80GB80 GB HBM2e600 GB/s NVLink400 WIn production
L40S48 GB GDDR6864 GB/s PCIe5350 WInference fleet
Hyperscale fabricInfiniBand NDR 400G16:1 non-blocking—Live
harchos-cli · provision
live
$ harchos login --region dakhla
→ authenticated · tenant harch-corp-prod
$ harchos gpu provision --type H100 --count 8
→ reserving 8x H100 SXM5 · Dakhla Hub #001
→ InfiniBand fabric configured · NCCL verified
→ liquid cooling loop nominal · 24.1°C delta
→ provisioning ok · elapsed 87.4s
ubuntu@harch-gpu-001:~$ nvidia-smi --query-gpu=name,memory.total --format=csv
name, memory.total [MiB]
NVIDIA H100 80GB HBM3, 81920 MiB
NVIDIA H100 80GB HBM3, 81920 MiB
... 8/8 GPUs ready for workload
// 06Models

African-language LLMs

47 African languages by 2027. Harch Intelligence trains and hosts open-weight LLMs for Arabic, Wolof, Swahili, Hausa, Amazigh, and more — on African compute, with African data, for African builders.

ArabicWolofSwahiliHausaAmazighDarijaFulfuldeYorubaIgboShonaZuluXhosaBambaraSoninkéMalagasy+32 more → 47 by 2027
13B

Darija-13B

Moroccan Darija + MSA

Fine-tuned on 4.2B Moroccan tokens. Open weights. Hugging Face: harch/darija-13b.

7B

Sahel-7B

Wolof, Fulfulde, Bambara

Sahel region multi-lingual. Trained with Senegalese universities. Open weights.

70B

Swahili-70B

Swahili, English

Flagship East African model. 70B parameters. 8-node H100 training cluster.

8B

Amazigh-8B

Tamazight, Tachelhit, Tarifit

First open-weight Amazigh LLM. IRCAM partnership. Tifinagh + Latin scripts.

Target: 99.98% uptime
// 07Reliability

Target: 99.98% uptime

Every Harch Intelligence hub is designed with redundant everything: power (2N UPS + diesel backup), cooling (N+1 chillers), network (3 submarine cables, 2 terrestrial), and security (24/7 SOC, biometric, mantrap). Target: 99.98% uptime SLA with service credits. Tier-III design with 2N power, N+1 cooling.

Operations centre · 24/7 NOC
// 08Network

5 hubs, 3 countries, 1 sovereign fabric

From Dakhla on the Atlantic to Casablanca on the Mediterranean, Harch Intelligence spans 5 hubs in development, connected by 4 submarine cable systems. Sub-50ms latency to 1.2B Africans. Zero egress fees between Harch regions.

5 hubs, 3 countries, 1 sovereign fabric
Dakhla
Casablanca
Tanger
Dakar
Abidjan
Planned hub· 5 planned
Submarine cable landing· 4 cables
Planned 2027–2029· 4 cities
submarine fabric
submarine fabric
  • ACE — Africa Coast to Europe · 12.8 Tbps · Casablanca + Dakar landing
  • MainOne — West African loop · 4.96 Tbps · Casablanca + Dakar landing
  • Africa Coast to Europe 2 — expansion 2026 · 16 Tbps · Tanger + Abidjan
  • 2Africa — 37 African landings · 48 Tbps · Dakhla spur 2027
// 09Carbon

100% renewable, 0.02 gCO2 per kWh

Harch Intelligence is powered by Moroccan solar and Senegalese wind. Carbon intensity 0.02 gCO2/kWh — 89% below the global datacenter average of 0.45 gCO2/kWh. Every training job reports its carbon footprint. ESG-compliant AI by default.

Energy mix · live
0.02

gCO2/kWh — 89% below industry average

Energy mix · live
100%

Renewable energy (solar + wind)

Energy mix · live
1.15

PUE — 30% below industry average

Energy mix · live
87

Job-level carbon footprint reporting

Energy mix · live
100% renewable
Solar 62%
Wind 38%
Energy mix · live
// 10Comparison

Harch Intelligence vs US cloud

CriterionHarchUS Cloud (AWS/GCP)
H100 price/hr$1.80$3.50
Data sovereigntyAfrican soilUS CLOUD Act
Energy100% renewableMixed
PUE1.151.5-1.6
Egress fees0 between African regions$0.09/GB
Latency from Africa<50ms150-300ms
ComplianceMoroccan Law 09-08US jurisdiction
Carbon footprint0.02 gCO2/kWhVariable
// 11Plans

Choose your GPU plan

Three plans for every AI workload. All include HarchOS, data sovereignty, and renewable energy.

On-Demand
Pay per hour
$1.80/hr H100
1-8 GPUs
  • H100, H200, A100 instances
  • Scale in 90 seconds
  • PyTorch, JAX, vLLM pre-installed
  • HarchOS dashboard
  • Carbon footprint per job
  • No commitment
Get started
Best value
Reserved
Best for teams
$1.08/hr H100
8-256 GPUs
  • Everything in On-Demand
  • 40% discount vs on-demand
  • Reserved capacity 1-3 years
  • Priority support SLA
  • Custom images
  • Volume discounts
Get a quote
Dedicated
Private cluster
Custom
256+ GPUs
  • Everything in Reserved
  • Dedicated hardware
  • Private network fabric
  • Custom SLA (target 99.99%)
  • On-site engineer
  • Multi-year contract
Talk to sales
// 12Innovation

Beyond conventional cloud

African LLMs. Optical computing. Quantum-ready. The future of AI infrastructure is being built today — by us.

African LLMs

Pre-trained LLMs for African languages (Arabic, Wolof, Swahili, Hausa, Amazigh). Open weights. HarchOS fine-tuning pipeline. 47 languages target 2027.

Optical computing

Silicon photonics for inter-GPU communication. 10x bandwidth, 50% lower latency. Pilot 2028. Partnership with Lightmatter.

Quantum-ready

Quantum annealing for optimization workloads. Partnership with D-Wave. Pilot quantum-classical hybrid pipeline 2028.

Edge inference

HarchOS Edge — deploy models to edge devices (phones, IoT, vehicles). Sub-10ms latency. On-device fine-tuning. Pilot 2027.

Sovereign AI in production
// 13Case studies

Sovereign AI in production

From Moroccan banks training fraud detection models to Senegalese startups building African-language LLMs, HarchOS powers sovereign AI across the continent.

Get started free
// 14Testimonials

Trusted by African AI teams

“We trained our fraud detection model on HarchOS. 40% cheaper than AWS, and the data sovereignty compliance was instant — no legal review needed.”
Yassine El Mansouri
CTO, Moroccan Bank of Commerce
“HarchOS lets us train African-language LLMs on African compute. Latency from Dakar is 12ms. This changes everything for Senegalese AI.”
Awa Diop
Founder, Noolon AI Senegal
“The carbon footprint per job reporting is incredible. We can show our ESG board exactly how much CO2 each training run used. Game changer.”
Laila Benali
Head of AI, OCP Group
// 15Flow

From signup to first model

Five steps. Ninety seconds to first GPU. Two weeks to production inference.

01

Signup

Create HarchOS account. Verify identity (KYC per Moroccan law). Add payment method.

$ harchos signup --email you@startup.ma --verify-kyc
02

Provision

Choose GPU type, quantity, region. Scale from 1 to 1024 GPUs in 90 seconds.

$ harchos gpu provision --type H100 --count 8 --region dakhla
03

Connect

SSH, Jupyter, or HarchOS SDK. PyTorch, JAX, vLLM pre-installed. Import your data.

$ ssh trainer-0.dakhla.harchos.africa -J bastion.harchos.africa
04

Train

Launch training jobs. Real-time telemetry. Auto-scaling. Spot instances for 70% savings.

$ harchos job submit --script train.py --gpus 8 --spot
05

Deploy

Deploy models to HarchOS Inference endpoints. Auto-scaling. Pay per token. Sub-50ms latency.

$ harchos deploy --model falcon-40b-finetune --replicas 4
harchos-cli · session log
live
$ harchos signup --email you@startup.ma --verify-kyc
step 01 — Signup
$ harchos gpu provision --type H100 --count 8 --region dakhla
step 02 — Provision
$ ssh trainer-0.dakhla.harchos.africa -J bastion.harchos.africa
step 03 — Connect
$ harchos job submit --script train.py --gpus 8 --spot
step 04 — Train
$ harchos deploy --model falcon-40b-finetune --replicas 4
step 05 — Deploy
model deployed · https://inference.harchos.africa
// 16Simulator

See your GPU cost

Enter your monthly GPU hours. See cost vs US clouds.

2,000GPU-hr / mo
10010K20K
Harch / mo
$3,600
Monthly GPU hours needed
AWS / mo
$7,000
vs US cloud
3-yr save
$122,400
3-yr · 3-yr save

Estimate based on $1.80/hr Harch vs $3.50/hr AWS p5.48xlarge. Custom quote within 48h.

// 17Sectors

Solutions by sector

Fintech
Healthcare
Agriculture
Government
Research
E-commerce
Media
Defense
// 18Applications

Sovereign AI for every workload

From LLM training to inference, from computer vision to scientific computing — HarchOS supports every AI workload. African data, African compute, African sovereignty.

01

LLM training

Train LLMs up to 70B parameters on African data. Multi-node training with NCCL over InfiniBand. Mixed precision, FSDP, DeepSpeed pre-configured.

02

Inference endpoints

Deploy models to autoscaling endpoints. vLLM, TGI, Triton supported. Pay per token. Sub-50ms latency from African edge.

03

Computer vision

Train and deploy CV models. Pre-built pipelines for agriculture (crop disease), security (ANPR), industrial (defect detection).

04

Scientific computing

HPC workloads for research institutions. Slurm scheduler. MPI, OpenMP. Partnership with Moroccan universities.

05

RAG & agents

Build RAG pipelines with African knowledge bases. Vector databases (pgvector, Weaviate). Agent frameworks (LangChain, LlamaIndex).

// 19Why Harch

The Harch Intelligence difference

African data sovereignty

Your data never leaves African soil. Moroccan Law 09-08 compliance. No US CLOUD Act exposure. No GDPR conflicts. Sovereign AI by design.

100% renewable energy

Powered by Moroccan solar and wind. PUE 1.15. Carbon intensity 0.02 gCO2/kWh. ESG-compliant AI. Carbon footprint per job reported.

48% cheaper than US clouds

H100 from $1.80/hr vs $3.50/hr AWS. No egress fees between African regions. Reserved capacity 40% off. Spot instances 70% off.

Harch Corp backing

Building in Public conglomerate. Strategic AI infrastructure for Morocco and Africa. We're building the continent's AI future.

// 20Process

From signup to first model

01

Signup

Day 1

Create HarchOS account. Verify identity (KYC per Moroccan law). Add payment method.

02

Provision

Day 1

Choose GPU type, quantity, region. Scale from 1 to 1024 GPUs in 90 seconds.

03

Connect

Day 1

SSH, Jupyter, or HarchOS SDK. PyTorch, JAX, vLLM pre-installed. Import your data.

04

Train

Day 2+

Launch training jobs. Real-time telemetry. Auto-scaling. Spot instances for 70% savings.

05

Deploy

Week 2+

Deploy models to HarchOS Inference endpoints. Auto-scaling. Pay per token. Sub-50ms latency.

// 21FAQ

Frequently asked questions

NVIDIA H100 (80GB), H200 (141GB), A100 (80GB). L40S for inference. All with NVLink and InfiniBand. H200 available Q1 2026.

// 22Resources

Documentation & downloads

Architecture specs, API docs, case studies — everything for due diligence.

HarchOS architecture

PDF · 3.8 MB

White paper on sovereign AI platform architecture. PDF, 24 pages.

API reference

PDF · 6.2 MB

Full HarchOS SDK and REST API documentation. PDF, 86 pages.

Data sovereignty guide

PDF · 2.4 MB

Moroccan Law 09-08, AU Convention, GDPR comparison. PDF, 18 pages.

OCP Group case study

PDF · 2.8 MB

How OCP trains fertilizer demand models on HarchOS. PDF, 10 pages.

// 23Geography

5 hubs across Africa

1,798 GPUs planned. 5 hubs. 3 countries. Submarine cable connected.

Dakhla
Dakhla
Dakhla
Flagship Hub
512 GPUs
Casablanca
Casablanca
Casablanca
HQ + Edge
256 GPUs
Tanger
Tanger
Tanger
Submarine Landing
384 GPUs
Dakar
Dakar
Dakar
West Africa Hub
256 GPUs
Abidjan
Regional Hub
192 GPUs
Lagos
Planning 2027
512 GPUs target
Nairobi
Planning 2028
512 GPUs target
Cape Town
Planning 2028
256 GPUs target
Accra
Planning 2029
256 GPUs target
HARCH · INTELLIGENCE
Free $500 credit. H100 instances in 90 seconds. Data stays in Africa.

Ready to build sovereign AI?

Get started freeCall us
H100 from $1.80/hr
Target: 99.98% SLA
Law 09-08
100% renewable
Backed by Harch Corp
Back to Harch Corp